Property complex for sale in Irkliev village
Ukraine,
Cherkasy Oblast, Cherkasy
- view exact location
Commercial Real Estate information
Terms of alienation: Simple sale
Owned Area Size: 9488 sq.m.
Specify the size of the land plot for rent: 5 hectares
Description
- Available on:
- English
- Русский
The facilities of the enterprise are located on land plots with a total area of 5.44 hectares. of which: 4.6051 hectares - the territory of the plant. On a lease basis until 2064; 0.8355 ha - auxiliary industrial land (there are treatment facilities on the territory). On a leasehold basis until 2027 Located in the very center of the village. the territory of the plant is fenced with a concrete fence. there are 7 entrances along the perimeter of the object. The property complex is very advantageously geographically located (Kiev - 180 km. Cherkasy - 50 km. Kremenchuk - 100 km). On the territory of the object there are: -Administrative building and shop. which are fully equipped (furniture. office equipment. air conditioners. refrigeration and trade showcases); -Three storages. equipped with German-made TM Bitzer and MAS refrigeration units with temperature control from +10 to -25 ° C. one of which is a free-standing basement type. with an area of 867.5m². with a working lift with a lifting capacity of 2 tons .. and two storage rooms that are part of it. total area of 400m²; -Production shops. which are located on the territory of the object - suitable for warehouses. the total area of the corresponding premises is 9488m²; -Water treatment facilities; -Garage for 2 cars and 2 cargo boxes; - checkpoint; -Water supply. including water tower: well. production up to 25m3 / hour. Н = 90m. -Power supply: TM-630/10 with a capacity of 630 kVA. 2pcs (plant territory); ASKUE - automatic control system for power management. - Boiler room. boiler DKVr-4-13 (liquid fuel and gas); Additional information: Since 2012, production at the plant has been stopped. Today, reconstruction is required for operation by profile. The plant's equipment is partially dismantled. The cost of implementation includes the main and auxiliary non