Agricultural complex for growing vegetables with a modern vegetable storage 10 00

Ukraine, Kiev Oblast, Kyiv - view exact location

Financial information

Payback period: On request

Gross Revenue: On request

Profit: On request

Cash flow: On request

Business information

Form of Ownership: Private ownership

Business status: Operating business

Terms of alienation: Simple sale

Number of staff: 25

Lifetime period: 4 year(s)

Description

Specialization of the agricultural company: growing vegetables (onions, carrots, beets). processing of vegetables (washing, polishing, packing). storage services for vegetables.

Characteristics of the object:

Commissioning date: end of 2013
Capacities for working with vegetable products up to 10,000 tons / year (expansion up to 25,000 tons / year is possible).
Storage technologies. installation and adjustment of refrigeration equipment was carried out by leading Dutch specialists.
The walls of the building are made of high quality heat-resistant panels.
The storage is divided into two blocks. Each unit has a separate refrigeration unit. Each block is divided into two refrigerating chambers for optimal placement of various types of vegetable products.
Fixed assets (real estate and equipment):

1. Land plot: 2.19 hectares (lease for 49 years from 05.06.2012) / rent per month - 1977 UAH. The remoteness of the plot from the residential sector - 5 km.
2. Real estate complex: 6 200 sq.m.
3. Cold storage rooms 4 pcs. 2,500 tons each
4. Work shop with automatic line
5. 2 floor grain warehouses
6. ZAV-40 grain cleaning machine
7. Automobile weighing machine - 60 tons
8. Land for growing vegetables - 340 hectares
9. Container for storage of products: 6,000 pieces of wooden boxes for 1 200 kg each
10. Coverage of the site: 50% asphalt / 50% road slabs
11. Specialized equipment and machinery:

A complete list of fixed assets is available on request.

Sale of vegetable storage 2

Communications:

1. Electricity: 1000 kW (own substation)

2. Water: well

3. Sewerage: own filtration and water treatment system

4. Video surveillance system and security

5. Perimeter fences

6. Delete the length of the object to the railway station - 10 km.

Manpower:

118 833 USD
Андрей Joined since August 2020