Business for sale - construction of a residential complex
Ukraine,
Kiev Oblast, Brovary
- view exact location
Financial information
Payback period: 1 year(s)
Gross Revenue: On request
Profit: On request
Cash flow: On request
Business information
Form of Ownership: Private ownership
Business status: Operating business
Terms of alienation: Simple sale
Number of staff: On request
Lifetime period: 3 year(s)
Description
- Available on:
- English
- Русский
Business project for the construction of a residential complex for 50 townhouses (5000 sq. M) in the village of Skibin, Brovarsky district, Kiev region. The village of Skibin is located 20 km from Kiev and 4 km from Brovary along the Chenigovsk highway. Plot - 1.68 hectares. incl. 1.48 hectares for the construction of a residential complex and 0.2 hectares for the construction of a kindergarten (investment obligations - construction of a “box” of a kindergarten) + 0.1 hectares for drilling a well to provide water to a residential complex and a kindergarten. Project cost - 260 thous. USD. The price includes: - corporate rights of the manager of the land plot - LLC; - corporate rights of the housing cooperative - the developer. which works on the basis of the Agreement on joint activities. In addition, the price includes all work on the preparation of construction: - Technical conditions were received from Kievoblenergo for the connection of a residential complex (power 310 KW); - made a temporary connection of the email. energy to ensure the production of construction work at the construction site on the basis of an agreement with Kievoblenergo (power 16 KW); - Technical conditions were received from Kievoblgaz for gasification of a residential complex; - 350 meters of asphalt road were arranged from Brovary and 500 meters of paved road from the Zalesye side was restored. leading to the residential complex; - a well was arranged and equipped with a depth of 36 meters to provide water for construction work on the site; - a construction fence of 430 meters was installed to fence the construction site; - removed and buried the top (fertile) layer of soil at the construction site; - geological and geodetic surveys of the territory were carried out; - construction of the first block of 5 townhouses (114 sq.m. each) has begun. Construction readiness - 30 percent.